Measurement of the Risk of Insufficient Capacity of the Construction Project Manager Based on Individual-Environment Fit
LI Jingjing,ZHANG Feilian,LIU Jianjun,WANG Jing
(1.School of Engineering,Central South University,Changsha 410083,China;2.College of Traffic and Transportation Engineering,Changsha University of Science and Technology,Changsha 410114,China;3.Hunan Radio and TV University,Changsha 410004,China)
LI Jingjing,ZHANG Feilian,LIU Jianjun,WANG Jing. Measurement of the Risk of Insufficient Capacity of the Construction Project Manager Based on Individual-Environment Fit[J]. Journal of Jishou University(Social Sciences), DOI: 10.13438/j.cnki.jdxb.2018.02.019.
[1] 宋明哲.风险管理新论:全方位与整合[M].台北:五南图书出版社,2012.
[2] Low Sui Pheng,Larry Yeap.Quality Function Deployment in Design/Build Projects[J].Journal of Architectural Engineering,2001(2).
[3] 姜黎辉,张朋柱,彭诗金.技术机会识别能力与企业网络合作能力关系研究[J].科技进步与对策,2006(7).
[4] Ali Reza Afshari.Methods for Selection of Construction Project Manager:Case Study[J].Journal of Construction Engineering and Management,2017(2).
[5] Awad S.Hanna,Michael W.Ibrahim,Wafik Lotfallah,Karim A.Iskandar,Jeffrey S.Russell.Modeling Project Manager Competency:An Integrated Mathematical Approach[J].Journal of Construction Engineering and Management,2016(8).
[6] Herrera F,Matinez L.The 2-tuple linguistic computational model:advantages of its linguistic description,accuracy and consistenc[J].International Journal of uncertainty,Fuzziness and Knowledge Based Systems,2001(9).
[7] 张肃.基于二元语义关联分析的多属性群决策方法[J].统计与决策,2017(11).
[8] 吴彩洪.木桶原理的应用及其扩展效应[J].企业技术开发,2013(11).